Construction of the Base and Brickwork

  • Preliminarey site visit by our builder to assess ground conditions and brick styles
  • Removal of any existing structure, base, patio area. trees or shrubs as well as surplus top soil.
  • Excavate footings – minium of 450mm deep and 500mm wide.
  • Reinforcing mesh used where possible then concrete poured into footings.
  • Hardcore used as infill with sand laid on top prior to laying the damp proof membrane.
  • 50mm rigid insulation is fitted in the floor slab. Once this is all compact and level, a 100mm layer of concrete will be poured on top, then trowel finished, leaving your conservatory finished floor level at approximately the same height as the house damp proof course.
  • Following this will be the construction of the Orangery or Conservatory walls. The brickwork will have a 60mm cavity, which will have 25mm rigid polystyrene insulation inserted to provide increased energy efficiency.
  • Any drainage needed for rainwater dispersal will be provided.

 